We are now well into construction at our house and it is coming along slowly but surely! At this point all of the major stuff is finished! We now have a new electrical system, new HVAC system, new plumbing, new roof and a whole of lot of walls ripped out and a lot of new walls framed in! It is so exciting! Below are some pictures of before and where the construction is at at this point. The pictures defiantly make it look as though we have gotten little done but, now that all the "bones" of the house have been fixed, finishing work will start happening very soon and quickly! (that is after we actually pass of our city inspections, we are on inspection #3 for electrical) Next up is new drywall for most the house, a refinished bathroom, a new kitchen, refinished hardwood floors and a whole lot of painting! More pictures to come for sure!

Our old HVAC system. We have had a lot of trash hauled from the house.


We ripped out this load bearing wall in order to open the kitchen to the dining room and living room! We plan to put a little peninsula of cabinets between the kitchen and dining room!


The Dining Room at another angle.

Nothing in the kitchen stood a chance of sticking around. Well, except for the door! We thought it was cool :)

The kitchen demolished! We also had to replace all of the floor joyces (sp?) in the kitchen as they were uber rotted out.

The old apartment that was rented out in the back of the house

Now it is framed out as our Master Bedroom with a hallway, laundry closet and closet!